Yellostone microtopping
How to apply microtopping, step by step
From substrate to varnish: 4 to 5 days on site, 7 days before normal use.
Yellostone microtopping, often called microcement, is ready to use: no powder to mix, and it does not dry out in the tub, so you have time to work. A careful DIYer can apply it themselves. This guide follows our application datasheet, which you can download from the kit page.
Before you start
- Do a test on a board or a sample: you will get your technique right before the real job.
- Ventilate or heat: a fan or a site heater speeds up the drying of the microtopping and the varnish.
- Allow the time: 4 to 5 days to apply, then 7 days before normal use.
The equipment
- A sander, abrasives in 40/60, 60 and 120 grit, and a vacuum cleaner.
- A roller for the primer and the varnish.
- A trowel or a spatula for the two A coats.
- A plastic smoothing spatula for the B coat.
- A paint mixer to blend the varnish with its hardener.
1. Prepare the substrate
Sand the substrate with 60 grit, then vacuum. Over tiles, first fill the grout lines with a skim to zero, using a ready-to-use tile adhesive: otherwise they show through (see microtopping over tiles). On underfloor heating, switch the screed on for 24 h before you start.
2. Apply the primer
Roll on the bonding primer at 100 to 120 g per m². It dries in 2 to 8 h depending on the substrate.
3. First A coat
Mix the A tubs to even out the texture and the colour. Spread about half of the A tubs with a trowel or a spatula, 1 mm thick (about 1 kg/m²). This coat does not affect the final look. It hardens in 2 to 6 h: a visual check is enough.
Then lightly sand with 40/60 grit, just to knock off any excessive ridges, and vacuum.
4. Second A coat
Apply the rest of the A tubs with random strokes, aiming for a fairly smooth result. This stroke creates the final effect: grained, shaded or more textured. Sand as for the first coat, keeping slight reliefs: heavy sanding wipes out the material effects.
5. The B coat, the finish
Mix the B tubs; if the product is too thick, add a little water. Work it with a plastic smoothing spatula, pressing and scraping the coat to fill the hollows left by the A coat. After 12 to 24 h of drying, sand lightly with 120 grit, then vacuum thoroughly.
Wait 24 h before applying the varnish.
6. Two coats of varnish
Filter the varnish, then mix it with its pre-measured hardener for 1 minute with the mixer: a poorly blended mix is less resistant. The mix must be used within 30 minutes.
- Matt finish: two coats by roller, 3 to 24 h apart. The milky look disappears as it dries; even out any white overlaps.
- Satin finish: one impregnation coat, on a floor above 12 °C, then the satin varnish the same day, 1 to 4 h later. A second coat of varnish is recommended in a shower or on a worktop.
Drying
After 24 h, the microtopping is still fragile: it hardens in contact with the air for at least 7 days.
- Do not cover the surface (tarpaulin, cardboard) while it dries.
- Do not walk on it or put anything on it for 3 to 4 days.
- No water for 3 days.
- Hardening is complete after 7 days at 20 °C.
Mistakes to avoid
- Sanding too fine between the A coats: a fine abrasive "burns" the surface and darkens the shade.
- A stainless steel trowel for the B coat: it leaves grey marks.
- Poor vacuuming before the varnish: a grain of sand leaves a tiny hole at the slightest wear.
- Varnishing too early: wait 24 h after the B coat.
Getting help
To get a feel for it, we offer training courses. Your stockist will help you plan the job. For a walk-in shower, a trained applicator is recommended.
What surfaces can microtopping go on?
| Substrate | Application | Main condition |
|---|---|---|
| Cement screed or slab | Suitable | Sound, dry, stable and prepared substrate |
| Underfloor heating | Suitable, following the protocol | Heating run beforehand, stability, movement joints respected |
| Existing tiles | Possible after inspection | Adhesion, stability, sanding and the right primer |
| Plasterboard on walls | Suitable | Rigid boards, treated joints and preparation |
| Wood or wood-based panels | Suitable except solid wood | Dimensional stability and sound assembly (screwed and glued) |
| Terracotta or damp substrate | Not recommended on substrates soaked deep with old oil or wax. Max. moisture 5% | Surface and moisture check required beforehand |
Frequently asked questions
How long does it take to apply microtopping?
4 to 5 days on site: primer, three coats of microtopping with their sanding, then two coats of varnish. Allow 7 days before normal use.
Can I apply microtopping myself?
Yes. The product is ready to use and does not dry out in the tub. Do a test before the real job; for a walk-in shower, a trained applicator is recommended.
How many coats do I need?
One primer, three coats of microtopping (two A coats and one B coat), then two coats of varnish.
What tools do I need?
A sander, a vacuum cleaner, a roller, a trowel or a spatula for the A coats, a plastic smoothing spatula for the B coat, and a paint mixer for the varnish.
When can I walk on microtopping?
Not before 3 to 4 days, and no water for 3 days. Full hardening takes 7 days at 20 °C.
